Building Resilient Infrastructure

                                                  

This report reviews the decision-making process for new infrastructure and emphasizes the need to embed resilience into this process and practical guidance to do so. It is based on findings that show critical infrastructure is highly vulnerable to, and a major casualty of, natural disasters. Repairing or replacing infrastructure after a natural disaster is often costly and difficult, and can worsen the suffering of affected communities.

The report makes three key recommendations:

– Improve infrastructure planning processes: integrate resilience in government and industry decision-making by adopting the principles for resilience in infrastructure planning;

– Improve incentives: prioritize policy changes and funding arrangements that ensure disaster resilience is considered and incorporated, where appropriate, into infrastructure planning;

– Improve capacity: government and industry should work to strengthen the technical capacity of practitioners to identify, analyze and evaluate the costs and benefits of resilience options.

Australian Business Roundtable for Disaster Resilience & Safer Communities and Deloitte Access Economics, March 2016 

Online Report
http://australianbusinessroundtable.com.au/assets/documents/Report%20-%20Building%20Resilient%20Infrastructure/Report%20-%20Building%20resilient%20infrastructure.pdf

Are you sure you want to delete this "resource"?
This item will be deleted immediately. You cannot undo this action.
File Name File Size Download
building_resilient_infrastructure.pdf

Related Resources

Report
15 Jan 2020
The Programme of the 2020 CAP Implementation Workshop, ​29-30 September, is posted here.
Tags: Report, Early Warning Systems
Assessment or evaluation, Case Study, Report
27 Jul 2017
la Federación Internacional de  Sociedades de la Cruz Roja y la Media Luna Roja (FICR) y el Programa de las Naciones Unidas para el Desarrollo (PNUD) han trabajado conjuntamente en un informe multinacional orientado a evaluar los marcos jurídi...
Tags: Assessment or evaluation, Case Study, Report, Disaster Law
Report
17 Sep 2015
A Presentation at the 2015 CAP Implementation Workshop (Rome, Italy 23-24 September)
Tags: Report, Early Warning Systems
Scroll to Top